Categories

house update

Almost six months have past and the list looks almost the same, but strangely enough, much has happened under the covers. New heating ducts and a furnace, rebuilt and insulated attic, deck rebuilt, new roof going on next week, plumbing fixed.

Todo:

  • electrical: ground/replace parlor outlet, add office outlet, add tv wall outlet (tomorrow)
  • roofing: new tar roof, eyebrow vents, fix flashing (next week)
  • carpenter: finish patching walls, attic ladder, bracing for tv, finish attic insulation (next week)
  • flooring: refinish hardwood floors (still need to pick stain color)
  • heating: final inspection
  • painting: color selection, paint and seal exterior, paint interior, stain deck
  • select a hot tub under deck, investigate moisture damage possibility for deck
  • electrical part 2: service upgrade, Tesla charger (220/70a), power for hot tub
  • get an arborist out to look at trees up front
  • webcam and water cannon to shoot neighbor when he throws shit in my driveway
Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • StumbleUpon
  • Technorati
  • Tumblr
  • Twitter

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>