Almost six months have past and the list looks almost the same, but strangely enough, much has happened under the covers. New heating ducts and a furnace, rebuilt and insulated attic, deck rebuilt, new roof going on next week, plumbing fixed.
Todo:
- electrical: ground/replace parlor outlet, add office outlet, add tv wall outlet (tomorrow)
- roofing: new tar roof, eyebrow vents, fix flashing (next week)
- carpenter: finish patching walls, attic ladder, bracing for tv, finish attic insulation (next week)
- flooring: refinish hardwood floors (still need to pick stain color)
- heating: final inspection
- painting: color selection, paint and seal exterior, paint interior, stain deck
- select a hot tub under deck, investigate moisture damage possibility for deck
- electrical part 2: service upgrade, Tesla charger (220/70a), power for hot tub
- get an arborist out to look at trees up front
- webcam and water cannon to shoot neighbor when he throws shit in my driveway