Monthly Archive for September, 2008

house update

Almost six months have past and the list looks almost the same, but strangely enough, much has happened under the covers. New heating ducts and a furnace, rebuilt and insulated attic, deck rebuilt, new roof going on next week, plumbing fixed.

Todo:

  • electrical: ground/replace parlor outlet, add office outlet, add tv wall outlet (tomorrow)
  • roofing: new tar roof, eyebrow vents, fix flashing (next week)
  • carpenter: finish patching walls, attic ladder, bracing for tv, finish attic insulation (next week)
  • flooring: refinish hardwood floors (still need to pick stain color)
  • heating: final inspection
  • painting: color selection, paint and seal exterior, paint interior, stain deck
  • select a hot tub under deck, investigate moisture damage possibility for deck
  • electrical part 2: service upgrade, Tesla charger (220/70a), power for hot tub
  • get an arborist out to look at trees up front
  • webcam and water cannon to shoot neighbor when he throws shit in my driveway